Air Quality Assessment for a Minor Development: Statement or Full AQA
An air quality assessment for a minor development in London is often not needed at all. Every London scheme must be Air Quality Neutral under London Plan Policy SI 1. For 1 to 9 homes, though, the Greater London Authority's (GLA) guidance says a full assessment "will likely not be required". A heat pump, gas boilers rated under 40 mg/kWh of NOₓ or a link to an existing heat network passes the building test. Parking within the London Plan maximum passes the transport test. A short Air Quality Neutral statement then usually does the job.
The exceptions are sites where the council asks for more. The usual ones are an Air Quality Focus Area, homes on a busy road, people living below ground and combustion plant. A council's validation list can also name the assessment.
This guide sets out the minor development rule, the two simplified tests and what the statement says. It then uses a decided Brent application where the officer accepted a statement. Two AFC jobs show the full route. In Barking, five flats at a town-centre junction needed a designed ventilation scheme under a condition. In Brixton, three flats sit beside Brixton Road.
Not sure whether your scheme needs a statement or a full assessment? Send us the address, the number of homes, the heating and the parking through our fee proposal form. We will tell you which one your council will expect. Our Air Quality Neutral page explains the benchmarks.
What "Air Quality Neutral" means for every London scheme
Policy SI 1 of the London Plan 2021 sets the requirement. Part B(2)(a) says that, as a minimum, "development proposals must be at least Air Quality Neutral". Part B(2)(c) adds that "major development proposals must be submitted with an Air Quality Assessment". Nothing in the policy asks the same of minor schemes.
The detail is in the GLA's Air Quality Neutral London Plan Guidance, adopted in February 2023 (the PDF). It sets two benchmarks, one for each of the two main sources of pollution from a new development (paragraph 2.1.1).
The Building Emissions Benchmark (BEB) covers "emissions from equipment used to supply heat and energy to the buildings".
The Transport Emissions Benchmark (TEB) covers "emissions from private vehicles travelling to and from the development".
"A development must meet both benchmarks separately in order to be Air Quality Neutral" (paragraph 2.1.2). A scheme that fails one is expected to change its design first. Mitigation comes next, and an offsetting payment only after that (section 5).
Some schemes need no Air Quality Neutral assessment at all. Paragraph 2.2.1 says developments "that do not include additional emissions sources are assumed to be Air Quality Neutral". Its examples are schemes with "no additional motor vehicle parking", no increase in motor vehicle movements and no "new combustion plant such as gas-fired boilers". The guidance calls it "good practice" to tell the council so in a cover letter or the planning statement.
Our earlier article on Air Quality Neutral for London developers covers the benchmarks for major schemes. The rest of this guide is about the small ones.
Air quality assessment for a minor development: the GLA rule
Paragraph 2.3.1 of the guidance opens: "All developments in London are expected to meet the Air Quality Neutral benchmarks." It then sets out the minor development rule for the schemes in the table below:
"a full air quality assessment (which would normally incorporate the AQN Assessment) will likely not be required (unless required by the local planning authority as set out in 2.3.3 below)."
Kind of scheme | Minor under paragraph 2.3.1 when |
|---|---|
Homes, number given | 1 to 9 dwellings inclusive |
Homes, number not given | Site area under 0.5 ha |
Non-residential | Floor space under 1,000 m², or site under 1 ha |
For these schemes the guidance gives "a simplified procedure", in paragraphs 3.1.1, 3.1.2, 4.1.1 and 4.1.2. Paragraph 6.1.1 says how to report it: "use the simplified procedure as set out in paragraphs 3.1.1 and 4.1.1 and include relevant details in a cover letter or in other planning application documents."
That is the Air Quality Neutral statement. It is a page or two in the planning statement, or a short standalone note. It is not a technical report with monitoring data and modelling.
The rule has a limit. Paragraph 2.3.3 reads: "In certain cases, such as developments in an Air Quality Focus Area, the local planning authority may require a full air quality assessment for a minor development due to the nature or location of the proposed scheme." Where that happens, the full procedure for both benchmarks is used. Figure 1 sets out the two questions.

Figure 1. Statement or full assessment: AFC's summary of the GLA guidance, not the law. Your council's validation list decides.
The two simplified tests, and how a short statement passes them
The building test (paragraph 3.1.1)
Where a minor scheme includes new heating, it "can be assumed to meet the BEB" in any of three cases.
"the new heating system is a heat pump or other zero-emission heat source".
"the new heating system includes one or more individual gas boilers with NOx emissions rated at less than 40 mg/kWh".
"the development is connecting to an existing heat network."
If none applies, "a full AQN Assessment against the BEB is required" (paragraph 3.1.2). One case fails outright. Paragraph 3.1.5 sets the benchmark for particulate matter at zero. So "Any development that uses solid or liquid fuels for primary or secondary heating will therefore not be Air Quality Neutral". A wood-burning stove in a living room is enough to fail.
The transport test (paragraph 4.1.1)
Where a minor scheme includes new parking, it "can be assumed to meet the TEB if the maximum parking standards set out in policies T6 and T6.1 to T6.5 of the London Plan are not exceeded."
For homes, the maximum is in Table 10.3 of the London Plan. Some locations are car free, apart from disabled persons parking. They are the Central Activities Zone, Inner London Opportunity Areas, Metropolitan and Major town centres, all areas of PTAL 5 to 6 and Inner London PTAL 4. Elsewhere the maximum runs from 0.25 spaces per home in Inner London PTAL 3 up to 1.5 spaces in Outer London PTAL 0 to 1. A car-free scheme is within every maximum.

Figure 2. Air Quality Neutral for a minor scheme in two lines. Paragraph numbers are those of the GLA guidance (February 2023).
What the statement says
A statement that a case officer can accept without coming back covers these points.
The number of homes, or the floor space, and why the scheme is minor under paragraph 2.3.1.
The heating system, named. For gas boilers, the NOₓ rating from the manufacturer's data sheet, under 40 mg/kWh.
No solid or liquid fuel appliance, secondary heating included.
The number of parking spaces, the PTAL or town centre category, and the Table 10.3 maximum it sits within.
Any generator limited to emergencies and testing (paragraph 3.3.1 of the guidance).
A willingness to accept a condition on the heating and the parking.
Add a line on construction. It is not one of the Air Quality Neutral tests. London Plan Policy SI 1 Part D asks every scheme to show how it will "comply with the Non-Road Mobile Machinery Low Emission Zone" and reduce demolition and construction emissions "following best practice guidance".
The condition point matters. Paragraph 2.3.2 says the emission sources "should be set out in the planning application and may be secured by planning condition or legal agreement. For example, minimum emissions standards for combustion plant or maximum permitted car parking spaces." A statement that says "a heat pump or low-NOₓ boilers" leaves the choice open. The condition then holds the applicant to the 40 mg/kWh limit.
A decided example: the Brent officer who said a full assessment was not needed
Brent application 26/1677 was an outline scheme on a corner plot in Dollis Hill. It proposed the demolition of a detached house and the erection of a two-storey pair of semi-detached houses with a basement and loft. They were to be used as two houses in multiple occupation (HMOs) of 13 and 12 bedrooms. The site is in an Air Quality Management Area (AQMA). Two parking spaces were proposed. AFC had no part in the application.
There was no air quality assessment. The applicant's agent submitted a three-page Sustainability, Energy and Air Quality (BEB / Air Quality Neutral) statement with the application. It is dated June 2025, a year before the application was made, and the decision notice lists it among the documents that accompanied it. It is a good model of the format.
The primary commitment was a heat pump "(air source heat pump or equivalent zero-emission heat source)".
The alternative, if a heat pump proved not feasible at detailed design, was "A-rated boilers with NOx emissions of less than 40 mg/kWh".
Connection to an existing heat network would be considered if one became available.
The commitments could be "secured by suitably worded planning condition(s)", with a short compliance note before the heating was installed.
The Brent case officer's delegated report (pages 8 to 9) noted that the scheme must be Air Quality Neutral under Local Plan Policy BSUI2 and London Plan Policy SI 1. It then said: "A full air quality assessment is not generally required for minor schemes." The report set out the three building cases from paragraph 3.1.1 and the transport rule from paragraph 4.1.1. It concluded: "The two parking spaces are within maximum standards, therefore the TEB is met." On the heating commitment: "This would meet the BEB."
Brent refused the application on 9 September 2026, for a reason unrelated to air quality. The decision notice found that the "basement habitable accommodation by virtue of its siting below ground level and reliance on lightwells with obstructions, would provide inadequate daylight, sunlight and outlook". That was contrary to London Plan Policy D6 and Brent Local Plan Policy DMP1.
Two points follow for a minor scheme in an AQMA.
An AQMA alone did not trigger a full assessment. The statement went in with the application. The delegated report found both benchmarks met on the statement and the two parking spaces, with no assessment.
Write the boiler limit as the guidance writes it. The statement said "less than 40 mg/kWh", as paragraph 3.1.1 does. The officer's summary said "a maximum NOx emission of 40mg/kWh". A condition drafted from the summary would allow a boiler at exactly 40. Name a boiler rated below 40 and the point does not arise.
When the council will want a full assessment anyway
The minor development rule says "likely". Each council decides for itself, through its validation list and its officers. In AFC's experience of London applications, these are the cases where a statement is not enough.
An Air Quality Focus Area
Paragraph 2.3.3 names it. Paragraph 9.1.17 of the London Plan defines Air Quality Focus Areas as "locations that not only exceed the EU annual mean limit value for nitrogen dioxide (NO2) but are also locations with high human exposure". They are distinct from AQMAs, which the boroughs declare. The GLA publishes the current list on the London Datastore. Policy SI 1 B(2)(d) adds that proposals in Focus Areas "should demonstrate that design measures have been used to minimise exposure". A statement on heating and parking does not do that.
Lambeth's validation list puts it in one paragraph. The whole borough is an AQMA. The Local Information Requirements 2024 cover it under item 11, Air Quality Assessment, "All major and minor applications":
"For most minor developments, achieving Air Quality Neutral will be enough to demonstrate that they are in accordance with Policy SI 1(B1) of the London Plan (2021). However, where developments are in an Air Quality Focus Area (AQFA) or where characteristics of the development or local features raise concerns about air quality, or where there are additional requirements for assessment in local policy, a full Air Quality Assessment may be required."
Check the site before anything else with our London Air Quality Focus Area checker and the AQMA screening tool.
New homes facing a busy road or junction
Air Quality Neutral is about what the scheme emits. It says nothing about what the people living there will breathe. Where new bedrooms face a main road, a bus route or a signalised junction, officers ask about exposure. Brent's validation checklist for full applications asks for an Air Quality Assessment "where a sensitive use is proposed in close proximity to an existing source of air pollution". New homes are a sensitive use.

Illustrative AI image; not a real site or an AFC project.
People living below ground
Basement and lower ground floor rooms sit at the level of the street's exhaust. They also often depend on lightwells for air. Councils ask how those rooms will be ventilated with clean air, particularly in a Focus Area.
Combustion plant
Gas boilers not rated under 40 mg/kWh take the scheme out of the simplified building test. So do combined heat and power and generators used for anything other than emergencies. Paragraph 3.3.1 of the guidance expects emergency generators to be limited by condition to "an emergency and operational testing (less than 50 hours per year)". Any other use goes into the calculation.
Construction dust
On a small site, construction dust is usually handled by a construction management plan. Demolition, basement excavation and sites close to schools or homes are the exceptions. There a council may ask for a dust risk assessment to the Institute of Air Quality Management (IAQM) guidance. Our construction dust risk screening tool gives a first view.
What a full assessment adds
A full air quality assessment for a minor development has four parts a statement does not.
A baseline from the council's monitoring and modelled data.
The exposure of the new homes against the air quality objectives.
A construction dust assessment.
The Air Quality Neutral benchmarks on the full procedure.
Where the exposure warrants it, the assessment ends with design measures: where the windows open, where the ventilation draws its air, and what filters it uses. Our air quality assessment service in London sets out the scope. The do I need an air quality assessment page covers schemes outside London.

Illustrative AI image; not a real site or an AFC project.
Worked example: five flats at a Barking junction, in a Focus Area
The site and the condition
Barking and Dagenham granted permission 23/01021/FULL on 6 December 2023. It allowed a second floor extension creating five flats, four of one bedroom and one of two. The building is a parade at the junction of Longbridge Road (A124) and Fanshawe Avenue (A123), Barking. Five homes made it a minor development under paragraph 2.3.1.
The site location gave the council two reasons to look further. The whole borough is an AQMA, declared on 16 December 2008 for nitrogen dioxide (NO₂) and PM₁₀. The site also lies wholly within the Barking Town Centre Air Quality Focus Area. Two elevations front the highway, with a signalised gyratory about 40 m to the south-west.

Figure 3. Two elevations on A-roads and a gyratory 40 m away: why the council wanted a designed scheme, not just a statement (AFC report, 28 September 2026, Figure 1). Imagery © Esri, Maxar.
The permission carried condition 10, a pre-commencement condition: "No development shall commence on site until a scheme for protecting the residential occupants from external air quality shall be submitted and approved in writing by the Local Planning Authority." Its notes explain why:
"Due to the development being within a AQMA and Air Quality focus area with existing levels of pollutants being at, above or near to national limit values for nitrogen dioxide (NO2) the scheme should include mechanical ventilation designed to safeguard occupants from the ingress of the poor outdoor air quality."
An informative added that all development should be Air Quality Neutral, minor schemes of one to nine dwellings included.
AFC prepared the Air Quality Assessment and Ventilation Strategy for condition 10, issued on 28 September 2026.
The baseline from the council's own monitoring
No site monitoring was needed. Seven of the council's roadside diffusion tubes lie within 800 m of the site, four with an unbroken four-year record. In 2024 they recorded bias-adjusted annual mean NO₂ of 20.9 to 30.2 µg/m³. The nearest tube on an arm of the same junction, on Fanshawe Avenue 272 m away, recorded 26.4 µg/m³. No tube within 800 m exceeded the 40 µg/m³ objective in any year from 2021 to 2024. Concentrations fell at every tube with an earlier record.

Figure 4. Seven council roadside tubes within 800 m: 20.9 to 30.2 µg/m³ NO₂ in 2024 (AFC report, Figure 3). Basemap © OpenStreetMap contributors.
The London Atmospheric Emissions Inventory (LAEI) 2019, interpolated to the 2027 opening year, gives a site maximum of 26.5 µg/m³ NO₂. The figures for PM₁₀ and PM₂.₅ are 23.3 µg/m³ and 11.4 µg/m³. The modelled surface also shows where the air is cleaner. At the rear of the building, facing an enclosed yard, NO₂ is 18.6 to 18.7 µg/m³. That is 7.8 to 7.9 µg/m³ below the corner at the junction.

Figure 5. Modelled NO₂ across the site: the rear yard is about 8 µg/m³ cleaner than the road corner (AFC report, Figure 4, LAEI 2019 interpolated to 2027).
The report took the highest 2024 tube result within 1 km, 30.2 µg/m³, as the reasonable worst case at the facade. That is 75.5% of the 40 µg/m³ annual mean objective, a margin of 9.8 µg/m³. Exposure of the new occupants was within the objectives.
Air Quality Neutral on the full procedure
Five flats could have used the simplified tests. The report applied the full procedure to both benchmarks instead. Paragraph 2.3.3 names Focus Areas, and Policy DMSI 4(3) of the Barking and Dagenham Local Plan provides for close scrutiny of the approach to air quality in them.
The building benchmark for 340 m² of new residential floorspace was 1,190 gNOₓ a year. The flats are all-electric, with no combustion plant, so predicted emissions were zero. The transport benchmark for five homes in Outer London was 2,235 trips a year. No parking was proposed. Barking is a Major town centre, where Table 10.3 of the London Plan sets the maximum as car free. Both benchmarks were met, with no mitigation or offsetting.

Figure 6. Both benchmarks passed with no parking and no combustion plant (AFC report, Tables 11 and 12, redrawn).
The result is the same as the simplified tests would have given. The difference is that the report shows the numbers, which is what a Focus Area invites the council to check.
The designed ventilation scheme
Condition 10 asked for a scheme, not only an assessment. A separate noise condition also applied. The acoustic consultant's assessment for it found that trickle ventilators and open windows could not be relied on for the road-facing facades. The two conditions were therefore met with one system.
Each flat has its own mechanical ventilation with heat recovery (MVHR) unit. It supplies 1 l/s more than the boost extract rate, so the flat is held at slight positive pressure. Supply air is filtered to ISO 16890 ePM1 ≥ 80%, with an activated-carbon stage for NO₂. Intakes and exhausts are on the rear (east and north) elevations only, at the highest practicable point beneath the eaves, facing the enclosed yard. Nothing is fitted to the Longbridge Road or Fanshawe Avenue elevations.

Figure 7. Intakes on the rear elevations only, below the eaves, away from both roads (AFC mark-up on the approved elevations, drawing PL208B, September 2026).
Our guide to the ventilation strategy for an air quality condition covers the filter classes, separations and commissioning in detail.
What the council said
The condition submission is 26/01341/AOD. On 5 November 2026 the council's environmental protection officer raised no point on the scheme itself. The officer added: "I would not recommend that the condition is fully discharged until the commissioning report has been received." The report had said a commissioning record follows installation, under part (b) of the condition. On 12 November 2026, the last time AFC checked, the condition submission was with the council. More on the job is in the Barking case study.
The lesson for a minor scheme at a junction like this one: Air Quality Neutral was the easy part. The council needed the exposure evidence, and a ventilation design that put the intakes where the data showed cleaner air.
Three flats beside Brixton Road, in a Focus Area
AFC's other recent minor scheme in a Focus Area is in Brixton. Lambeth application 26/00413/FUL proposes the change of use of a former education building to three flats. The basement holds cycle storage, refuse and recycling, and plant and communal storage; no one lives in it. The site is in a Brixton Air Quality Focus Area next to Brixton Road. Lambeth's automatic monitoring station on Brixton Road recorded annual mean NO₂ of 58.0 µg/m³ in 2023, above the 40 µg/m³ objective.

Figure 8. A Focus Area next to Brixton Road: a full assessment for three flats (AFC report, 17 October 2025, monitoring map). Basemap © OpenStreetMap contributors.
Two of the triggers above apply here: the Focus Area and the main road. AFC's assessment, submitted with the application, therefore covered construction dust, the exposure of the new flats and Air Quality Neutral. Dust risk was low for soiling and negligible for human health. Air Quality Neutral was met in the simplest way: car-free status for the transport benchmark, and all-electric heating and hot water for the building benchmark.
The design measures were filtered positive-input ventilation, intakes away from the road, and planting. The basement is ancillary space. The report still set out how its existing high- and low-level vents keep it ventilated.
The application was still awaiting a decision on Lambeth's register on 24 November 2026, so the council's view is not yet known. More on the job is in the Brixton case study.
Statement or full AQA: what to send us
Figure 1 is the short version. In practice, a minor scheme in London needs one of three things.
No Air Quality Neutral assessment when it adds no combustion plant, no parking and no extra car trips (paragraph 2.2.1). One sentence in the planning statement covers it.
An Air Quality Neutral statement when it adds a heat pump, low-NOₓ boilers or a heat network connection, and parking within the London Plan maximum, and none of the triggers applies.
A full air quality assessment when it is in a Focus Area, puts new homes on a busy road or below ground, or adds combustion plant. The same applies when the council's validation list asks for one.
To tell you which applies and to give a fee proposal, we need the following.
The site address and the red line plan.
The number of homes, or the floor space for other uses.
The heating system, with the boiler model if gas is proposed.
The number of parking spaces.
The floor plans, showing any homes in a basement or lower ground floor.
Any pre-application letter or validation request from the council.
Do I need an air quality assessment for a small development in London?
Usually not a full one. The GLA's Air Quality Neutral guidance (February 2023, paragraph 2.3.1) says a full assessment "will likely not be required" for 1 to 9 homes, or for non-residential schemes under 1,000 m². The scheme must still be Air Quality Neutral, which for a minor scheme is shown in a short statement. A council can ask for a full assessment in an Air Quality Focus Area, on a busy road, or where its validation list requires one.
What is an air quality neutral statement, and what goes in it?
It is a short note, in the planning statement or a cover letter, showing that a minor scheme passes the GLA's two simplified tests. It names the heating: a heat pump, gas boilers rated under 40 mg/kWh NOx, or an existing heat network. It confirms no solid or liquid fuel, and gives the parking against the London Plan maximum. Our Air Quality Neutral page explains the benchmarks.
Is a full air quality assessment needed for 1 to 9 homes in an AQMA?
Not because of the AQMA alone. Brent 26/1677 was a minor scheme in an AQMA. The case officer wrote that "A full air quality assessment is not generally required for minor schemes" and accepted a statement on heating and parking. An Air Quality Focus Area is different: the GLA guidance names it as a case where the council may ask for a full assessment.
Does a heat pump make my scheme air quality neutral?
It passes the building test. Paragraph 3.1.1 of the GLA guidance treats a heat pump or other zero-emission heat source as meeting the Building Emissions Benchmark. The transport test is separate: the parking must not exceed the London Plan maximum standards. Both must be met.
What NOx rating must a gas boiler have for air quality neutral?
Under 40 mg/kWh. Paragraph 3.1.1 says individual gas boilers "with NOx emissions rated at less than 40 mg/kWh". Name the boiler in the statement and attach the manufacturer's data sheet. A boiler at 40 mg/kWh or above takes the scheme to a full calculation against the benchmark.
My site is in an Air Quality Focus Area. Do I need a full assessment?
Expect to. Paragraph 2.3.3 of the GLA guidance gives Focus Areas as the example where the council may require a full assessment for a minor scheme. Lambeth's validation list says the same. The assessment then covers exposure of the new homes and design measures, as in AFC's Barking and Brixton jobs. Check the site with our Focus Area checker.
Can the council add an air quality condition instead of asking for an assessment now?
Yes. Paragraph 2.3.2 of the GLA guidance says the heating and parking "may be secured by planning condition or legal agreement". Councils also use pre-commencement conditions for exposure. The Barking permission for five flats required a scheme to protect residents from external air quality before work started. A ventilation strategy answers that kind of condition.
Do minor schemes outside London need an air quality assessment?
There is no Air Quality Neutral policy outside London. Whether a minor scheme needs an assessment depends on the council's Local Plan and validation list. It is most often asked for where new homes sit in or next to an AQMA or close to a busy road. Read the council's local validation list before the application goes in. Our do I need an air quality assessment page covers the national position.
Get a fee proposal
Air & Flood Consultants writes Air Quality Neutral statements, air quality assessments and ventilation strategies for planning applications and conditions across London. Not sure whether your scheme needs a statement or a full assessment? Send us the address, the number of homes, the heating and the parking through our fee proposal form. We will tell you which one your council will expect.