Diagram drawn by AFC: a cross-section from a house above the river design flood level of 62.10 mAOD down past a garage footprint partly below it, into a flooded hollow

Flood Map Wrong for My Site? How to Check It Against Ground Levels

Nick
6 days ago
7 min read

The question "is the flood map wrong for my site?" usually comes with a council letter: the plot is shown in Flood Zone 2 or 3, and nobody remembers it flooding. The Environment Agency's Flood Map for Planning is a national, modelled map that does not show risk plot by plot. Ground levels decide what floods, and they can be measured against the EA's own flood levels. The council will still want a flood risk assessment, because the planning tests run on the flood zone as mapped. For the opposite case, see needing a flood risk assessment when you are not in a flood zone.


Think the flood map is wrong for your site? Send us the council's letter and your site plan through our fee proposal form, and we will check the levels before you argue with anyone. See our flood risk assessment service.


What the flood map shows, and what it does not

The Planning Practice Guidance says: "A map showing river and sea flooding is available from the Environment Agency's Flood Map for Planning" (paragraph 001, Reference ID 7-001-20220825). Since 25 March 2025 the Flood map for planning has carried flood zone data from the new National Flood Risk Assessment (NaFRA) (GOV.UK).


The EA is plain about scale: its "national flood and coastal erosion risk products do not show risk at a property level" (GOV.UK). A zone edge from a 2 m model grid can split a garage from the house beside it.

Illustrative AI image; not a real site or an AFC project. A bungalow whose garden falls to a low meadow and a river

Illustrative AI image; not a real site or an AFC project.


Why the council still asks for a flood risk assessment

Validation and the Sequential Test run on the flood zone as mapped. The PPG says a site-specific flood risk assessment "should accompany a planning application where prescribed in footnote 55 of the National Planning Policy Framework" (paragraph 020, Reference ID 7-020-20220825). It should "make optimum use of information already available" (paragraph 021, Reference ID 7-021-20220825).


The EA's own guidance agrees: "A correction to the Flood Zones or other layers is rarely needed for planning decisions", because planning authorities rely mainly on site-specific FRAs, which build on and refine the flood map (GOV.UK). Our Do I need a flood risk assessment? checker screens whether a scheme needs one.


Is the flood map wrong for my site? How a consultant checks it

AFC checks the map in four steps, each on public EA data.


1. LiDAR on every footprint, not one spot level. The EA's LiDAR survey data, ground levels measured from aircraft, is published on a 1 m grid and is accurate to about ±0.15 m. AFC samples it at 0.5 m spacing over each footprint, so a garage on a slope gets its full range of levels.


2. Depth bands converted to levels. The national model gives depths in bands (under 150 mm, 150 to 300 mm, 300 to 600 mm). Each wet cell is read at the top of its band and added to the LiDAR ground under it, as the EA advises (Figure 1).


3. Which model governs. Where a local model and the national bands cover the same place, the EA advises using the local model, once checked as suitable.


4. Product 4 for the design level. EA Product 4 flood data gives the site's modelled levels and extents. The FRA sets a design flood level from it, with a tolerance, and tests the buildings at the upper value.

Diagram: LiDAR ground plus an EA depth band, read at the top of the band, gives a flood level of 61.95 to 62.10 mAOD

Figure 1: How an EA depth band becomes a flood level. Drawn by AFC from its FRA for the worked example below.


Worked example: a garage and extension near Coventry

In autumn 2026 AFC assessed a garage and a two-storey extension at a farmhouse near Coventry, in Warwick District. The council asked for an FRA because the garage site lies in Flood Zones 2 and 3. The applicant felt the map was wrong, since the garage ground was only slightly lower than ground shown as dry.


Product 4 arrived on 5 November 2026 with two models. The local River Sowe model gave a 1% AEP level with a 20% climate change allowance of 61.16 mAOD, and even its 0.1% AEP extent stayed clear of the buildings. The flood zone by the garage came from a culverted watercourse in a hollow beside it, which only the national model covered.


Read at the top of each depth band, the national model's wet cells gave one consistent river level: 61.95 to 62.10 mAOD in the 1% AEP event with the central climate change allowance for the 2080s. The river design flood level is the upper value, 62.10 mAOD, with a tolerance of ±0.15 m.


The LiDAR then split the site against that river level (Figure 2):


  • the house (ground 62.56 to 62.71 mAOD) and the entrance lobby (62.63 to 62.68 mAOD) stand 0.46 m or more above it;

  • the garage's original ground falls from 62.40 to 61.97 mAOD, so its eastern part is up to 0.13 m below 62.10 mAOD, although the model's 2 m cells showed the footprint as dry;

  • part of the extension is below it too: its north-east corner falls to 61.38 mAOD.

Schematic cross-section: the house above the river design flood level of 62.10 mAOD, the garage footprint partly below it, and a flooded hollow beside the garage

Figure 2: Levels decide. The same site is partly above and partly below the river design flood level. Drawn by AFC from its FRA.


The EA's surface water mapping shows a flow route along the same hollow. In the 1 in 100-year event with climate change (upper end, 2070s) it covers the whole garage and 69% of the extension, with water at about 62.2 to 62.6 mAOD, up to 0.5 m above the river level. Surface water therefore governs the garage and the extension, at a design level of 62.6 mAOD. The house and lobby lie outside the surface water extents, and the river level governs there.


Below the river level the garage takes up 3.93 m³ of floodplain and the extension 3.60 m³, 7.53 m³ in total. Lowering 257 m² of ground elsewhere on the site creates 59.24 m³ level for level below 62.10 mAOD. For the river alone a smaller lowering would do. Surface water sets its size: below 62.6 mAOD the buildings take up about 61 m³, and the lowering creates about 77 m³.


The extension and lobby floors are to be no lower than 62.70 mAOD (river level plus 600 mm), with flood resilience to 63.20 mAOD at the garage and extension (surface water level plus 600 mm). See our flood compensation guide for extensions for the design. The FRA was issued in November 2026; no decision has been made on the application.


Two AFC case studies turn on the same comparison: at Mill Place, Kingston upon Thames, a design level of 9.79 m AOD against a floor of 9.87 m AOD; at Charlton Mill, Hartlebury, buildings outside the modelled design extent, so no compensatory storage.


When the map really is wrong: the evidence review route

The EA's evidence review request is a separate process: "If you disagree with the flood or coastal erosion risk information shown for a location, you can contact us to discuss it" (GOV.UK). For rivers, the sea and the flood zones it considers new or updated modelling, recorded flood information, and topographical survey for small areas ("less than 250 sqm") where its ground levels are wrong. Surface water evidence goes to the Lead Local Flood Authority instead.


Incorporating new evidence "may take several months", the EA says, and modelling for a planning application has different requirements. AFC advises running any challenge alongside the application, never in place of the FRA.

Flowchart: measure the levels, then submit the FRA in every case, adding compensation where ground is below the design level and an evidence review request where the map is clearly wrong

Figure 3: Measure first, then decide the route. Drawn by AFC.


Traps

  • One spot level taken as "the site level". A point by the house says nothing about a garage on falling ground.

  • Comparing a ground level with a flood depth. A depth band is not a level until it is added to the ground beneath that cell.

  • Ignoring the tolerance. A margin of 50 to 100 mm sits inside the ±0.15 m of LiDAR.

  • Arguing the map instead of submitting levels. The officer cannot redraw the zone, but decides on the levels in the FRA.

  • Assuming the named river is the source. In the worked example the river left the buildings dry, and surface water set a higher level than the culverted watercourse. Floor levels follow the source that governs, as our finished floor levels guide sets out.

The flood map says my house is in Flood Zone 3 but it has never flooded. Is the map wrong?

Not necessarily. Flood Zone 3 is land with a 1% or greater annual probability of river flooding (0.5% or greater from the sea), which dry decades do not rule out. The levels on your plot settle it.

Can I challenge the Environment Agency flood map?

Yes, through an evidence review request to the EA, backed by new modelling, recorded flood information or, for areas under 250 m², topographical survey. Surface water mapping goes through the Lead Local Flood Authority. It may take several months (GOV.UK).

Do I still need a flood risk assessment if I think the flood map is wrong?

Yes, if the council asks for one: validation runs on the zone as mapped, and the EA says zone corrections are rarely needed for planning.

How do I find the flood level for my property?

Ask the EA for Product 4 data, or convert the national depth bands to levels on LiDAR. Our Product 4 guide covers the request.

My garage is only a few centimetres lower than the rest of the garden. Does that matter?

It can. In the worked example the garage's original ground fell from 62.40 to 61.97 mAOD against a river design flood level of 62.10 mAOD, so its lower part counted for river compensation. Surface water along the same hollow gave a higher design level, 62.6 mAOD, so the whole footprint counted for surface water storage.


Check the levels before you argue