Class MA prior approval flood risk is one of the matters a council must judge before an office, shop or other Class E building can become flats as permitted development. Paragraph MA.2(2)(c) of the General Permitted Development Order makes "flooding risks in relation to the building" a prior approval matter. In Flood Zones 2 and 3 the council consults the Environment Agency (EA) and expects a site-specific flood risk assessment (FRA). There is no Sequential Test, but the council still has to be satisfied that the new homes will be safe. In practice that turns on floor levels and on a safe way out to land beyond the flood.


This guide sets out what the Order says and what officers check. It then follows two Class MA applications for the same office building in Chertsey, refused on safe access and egress in 2026, with the evidence we submitted and the objections it drew. It ends with what to submit so the council has what it needs on the first application.


Converting a building in Flood Zone 2 or 3 under Class MA, or refused on flood risk? Send us the address, the floor plans and any decision notice, and we will tell you what the council will need. Request a fee proposal, or read about our flood warning and evacuation plans.


What Class MA says about flooding

Class MA of Part 3, Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015 permits a change of use from Class E (commercial, business and service) to Class C3 dwellinghouses. The building must have been in one of the qualifying uses for a continuous period of at least 2 years before the application (MA.1(1)(b)). The 3-month vacancy rule and the 1,500 m² floorspace cap were removed from 5 March 2024.


Paragraph MA.2(2) sets the prior approval matters. It opens: "Before beginning development under Class MA, the developer must apply to the local planning authority for a determination as to whether the prior approval of the authority will be required as to—". Item (c) is "flooding risks in relation to the building;". The other matters include transport, contamination, noise, natural light and, where they apply, conservation areas and fire safety.


Paragraph W sets the procedure, and MA.2(4) adapts it for Class MA. Where paragraph W(6) requires the EA to be consulted, the application must include "a site-specific flood risk assessment". Paragraph W(6) reads:


"Where the application relates to prior approval as to the flooding risks on the site, on receipt of the application, the local planning authority must consult the Environment Agency where the development is— (a) in an area within Flood Zone 2 or Flood Zone 3; or (b) in an area within Flood Zone 1 which has critical drainage problems and which has been notified to the local planning authority by the Environment Agency for the purpose of paragraph (zc)(ii) in the Table in Schedule 4 to the Procedure Order."

Three more parts of paragraph W matter here:


  • W(9): the council "may require the developer to submit such information as the authority may reasonably require in order to determine the application", including assessments of risks and statements of how they are to be mitigated.

  • W(10)(b): the council must "have regard to the National Planning Policy Framework", "so far as relevant to the subject matter of the prior approval, as if the application were a planning application".

  • W(11)(c): development may begin on "the expiry of 56 days following the date on which the application under sub-paragraph (2) was received by the local planning authority without the authority notifying the applicant as to whether prior approval is given or refused."


The Planning Practice Guidance (PPG) says the same about the FRA and the EA. Its flood risk and coastal change guidance states that prior approval applications "in areas of flood risk must be accompanied by a site-specific flood risk assessment", and that "Flooding prior approvals require consultation with the Environment Agency where the development is in an area within Flood Zone 2 or Flood Zone 3, or in an area within Flood Zone 1 which has critical drainage problems." (Paragraph 053, Reference ID 7-053-20220825.)


Is there a Sequential Test for Class MA?

No. The council decides a Class MA application on the matters listed in MA.2(2), and the Sequential Test is not one of them. The NPPF of August 2026 points the same way for changes of use generally: policy F5(2)(c)(iii) excludes "Changes of use, other than changes of use to a caravan, camping or chalet site, or to a mobile home or park home site" from the test.


That does not make flood risk a formality. A conversion to flats raises the vulnerability of the building. NPPF Annex F, Table 2 places "Buildings used for dwelling houses" in the more vulnerable class, and offices and shops in the less vulnerable class. Our flood risk vulnerability classification checker shows the class for any use.


The PPG makes the link between vulnerability and changes of use at paragraph 014: "changing from industrial use to residential use will increase the vulnerability classification from 'less' to 'more' vulnerable." It goes on: "As changes of use are not normally subject to the Sequential or Exception tests, when formulating policy, the local planning authority will need to consider what changes of use will be acceptable, taking into account the Strategic Flood Risk Assessment." (Paragraph 014, Reference ID 7-014-20220825.)


With no Sequential Test to pass, the question the council asks is whether the new homes will be safe. Paragraph W(10)(b) brings in the NPPF for that question, and the local Strategic Flood Risk Assessment (SFRA) usually sets the detail.


"Flooding risks in relation to the building": what officers look at

The Order asks about the building, not the whole red line. An approval in Egham shows how literally an officer can read that.


RU.26/0845 was a Class MA prior approval to change the ground-floor offices of a two-storey building on Grange Road, Egham (Runnymede) to residential use, giving two flats. The application was lodged with plans and a cover letter, without a flood risk assessment.


The officer report dealt with flooding in two sentences at paragraph 6.27: "It is noted that a very small part of the site falls within flood zone 2; however, the building itself is not within the flood zone. Therefore, the flooding risk to the building is considered acceptable." Prior approval was granted on 22 September 2026, with a land contamination condition.


The officer judged flooding risk on the building's footprint, not on the red line. Where the Flood Zone 2 or 3 edge runs close to the building, check the footprint against the current Flood Map yourself. A reading at this scale can differ from one assessor to the next. Where the building is in Flood Zone 2 or 3, the rest of this guide applies.


What officers look at, in order:


  • Where the building sits against Flood Zones 2 and 3 on the current Flood Map for Planning, not where the red line sits.

  • Which floors become homes. Ground-floor flats, and ground-floor bedrooms above all, carry the risk.

  • Floor levels against the design flood level, with climate change, and the resilience of anything below it. Our guide to finished floor levels in a flood zone sets out how they are set.

  • The way out: whether occupants can leave on foot to land outside the flood before or during the design flood.


Safe access and egress: the test that refuses Class MA schemes

NPPF policy F7 says that development in a location at risk of flooding should be refused unless, among other things, "Any residual risk can be safely managed, and safe access and escape routes are included where appropriate, as part of an agreed emergency plan" (F7(2)(c)). The Runnymede objections below cite it as "paragraph 181 section e of the NPPF", the numbering of the December 2024 version.


The PPG lists what to consider when judging whether development will be safe for its lifetime. One item is "the ability of residents and users to safely access and exit a building during a design flood and to evacuate before an extreme flood (0.1% annual probability of flooding with allowance for climate change)" (Paragraph 005, Reference ID 7-005-20220825). On emergency planning it adds: "Developers should seek to minimise reliance on emergency services to make development safe." and "Access routes should allow occupants to safely access and exit their dwellings in design flood conditions." (Paragraph 047, Reference ID 7-047-20220825.)


The national guidance leaves the acceptable depth and hazard on the route open. The local SFRA usually fixes them, and that is where Class MA applications are won or lost.


The Runnymede Drainage Engineer's two objections, both recorded in the RU.26/1089 officer report, set out the local test in full. On 2 July 2026 the objection was that safe access and egress had not been shown "to an area wholly outside of the flooded area, as required within section 8.16 of our SFRA 2018". On 3 September 2026 it quoted the Runnymede Strategic Flood Risk Assessment (SFRA) directly:


"It is considered acceptable for the access/egress route to be wet in Runnymede so long as the flood hazard is no greater than Very Low Hazard– Caution along the full length of the access/escape route. The route should also be along publicly accessible roads or paths."

The Runnymede SFRA (January 2018) is published on the council's website. Other councils set their own limits in their own SFRAs, so read the one for the site before the route is drawn.


Four conditions follow from that wording, and each one was tested on the Chertsey applications:


  • The destination is land wholly outside the flood extent. A dry spot that floodwater surrounds is not enough.

  • The hazard limit applies along the full length of the route. A single stretch above it fails the route.

  • The limit is the local one. In Runnymede it is "Very Low Hazard – Caution", the class below a flood hazard rating of 0.75 on the Defra and EA method (FD2320), not the "Extreme" class.

  • The route is on publicly accessible roads or paths, not across private land.


Hazard is worked out from depth, velocity and a debris factor, HR = d × (v + 0.5) + DF. Our flood hazard rating calculator runs the formula and shows which class a result falls in.

Illustrative AI image; not a real site or an AFC project. A raised paved walkway with railings leading from the entrance of a three-storey block of flats beside a small river up to a road on higher ground

Illustrative AI image; not a real site or an AFC project.


A first-floor refuge does not meet the test on its own. The Runnymede Drainage Engineer wrote on 3 September 2026: "A safe refuge approach as proposed in the updated FRA would not be supported as it will impact on the ability of the local authority and emergency services to safeguard the current population in Runnymede". A refuge is a fallback for people who did not leave in time. It is not the strategy for new homes.


Worked example: refused twice in Chertsey (RU.26/0824 and RU.26/1089)

The site and the proposal

Byfleet House on Guildford Road, Chertsey, is a detached two-storey office building on a corner plot beside the Chertsey branch railway line. Both applications sought prior approval under Class MA to convert the ground and first floor offices into 9 flats, 4 on the ground floor and 5 on the first. The building was not to be extended.


The current Flood Map for Planning (March 2025 data) places about 81% of the site in Flood Zone 3, with the rest in or at the margin of Flood Zone 2. Flooding at the site comes from an ordinary watercourse to the west that no EA model covered at the time. We prepared the flood risk assessment (March 2026), a Flood Warning and Evacuation Plan (6 August 2026) and site-specific flood modelling with an FRA addendum (24 August 2026).

Timeline of the two Chertsey Class MA applications: the Drainage Engineer's objection on 2 July 2026, RU.26/0824 refused on 6 August, RU.26/1089 lodged on 9 August with an evacuation plan, the addendum added on 25 August, the EA objection on 2 September, the second drainage objection on 3 September and the refusal on 21 September 2026

Figure 1. Two applications, three objections and two refusals between July and September 2026. Drawn by AFC from the RU.26/1089 decision notice and officer report and AFC's record of the RU.26/0824 decision.


The first application and the first refusal

Our first FRA for the site said Flood Zone 3 in its opening sections, and on page 16 said fluvial risk was low and the site in Flood Zone 1. The Drainage Engineer's objection of 2 July 2026 made that its first point: "In the initial sections the applicant states that the site is in Flood Zone 3, however in section 1 of page 16 of the assessment the applicant states fluvial flood risk is low and the site is in Flood Zone 1." Its second point was the missing route to an area wholly outside the flooded area. That first submission had no evacuation plan.


Runnymede refused RU.26/0824 on 6 August 2026. The Runnymede register was not available when this guide was written, so the reason below is quoted as it is recorded in AFC's file:


"The application introduces more vulnerable use in Flood Zone 3 and has not demonstrated a safe access and egress route required for the safety of future occupants."

The resubmission

RU.26/1089 was lodged on 9 August 2026 with our Flood Warning and Evacuation Plan. The plan set the strategy as evacuation before the onset of flooding, on an EA Flood Warning for the neighbouring Chertsey Bourne areas. Occupants were to walk about 97 m from the main entrance along the Guildford Road footway and over the level crossing. The assembly point was at the southern end of the Chertsey station car park.

Flood evacuation route from Byfleet House on Guildford Road, Chertsey, in green over the level crossing to an assembly point in the station car park, on the current Environment Agency Flood Zone 2 and 3 extents

Figure 2. The route the council did not accept: 97 m to the station car park, which the Drainage Engineer described as "surrounded by Flood Zones 2 and 3 on all sides". (AFC Flood Warning and Evacuation Plan, Figure 1.)


The plan reported the assembly point outside the current Flood Zone 2 and 3 extents. About 96% of the car park lay outside them. It recorded that, on the way, the route runs for 84 m within Flood Zone 3 and 2 m within Flood Zone 2. It read the EA's surface water hazard products along the route in metres. The plan took the design case as the High and Medium likelihoods, and in that case found no hazard rating of 0.75 or more anywhere on the route. A rating of 0.75 or more appeared only over 3 m at Low likelihood with climate change. The plan treated that stretch as residual risk.

Table of the 97 m route against EA surface water hazard thresholds: 0.25 and 0.50 or more over 20 m at Low likelihood today and 9 m Medium plus 21 m Low with climate change; 0.75 or more none today and 3 m at Low likelihood with climate change; nothing at 1.25 or 2.00

Figure 3. Hazard by length of route, the form an officer needs for every stretch. Redrawn by AFC from its plan (p.11).


On 25 August 2026 the addendum and an ordinary watercourse walkover survey were added to the file. The addendum reported a two-dimensional HEC-RAS model of the watercourse and its culverts on a measured topographical survey. At the 1% annual probability event with a 36% climate change allowance, the model gave a peak level of 14.657 mAOD. The modelled outline covered 87.9% of the site.


The flooding it found was shallow and slow. The maximum depth anywhere on the site was 0.603 m and the maximum velocity 0.235 m/s. The building stands on the highest ground in the boundary, between 14.420 and 14.579 mAOD. The maximum depth on its footprint was 0.244 m. The addendum set finished floor levels at 14.96 mAOD, 300 mm above that level, so far as the existing fabric permits.

Modelled flood depth at Byfleet House for the 1% annual probability event plus 36% climate change: shallow depths over most of the site, up to 0.6 m in the low ground at the south-west, the building footprint on the higher ground

Figure 4. Ponding up to 0.6 m on site, with the building footprint on the higher ground (AFC addendum, Figure 4, p.15).


The addendum also mapped hazard across the whole site. Table 6 classed 85.3% of the flooded area as "Low - caution" and 12.9% as "Moderate - danger for some". The remaining 1.8% was "Significant - danger for most", and none was Extreme. The maximum rating on the site was 1.318 and on the building footprint 0.130.

Modelled flood hazard rating at Byfleet House for the 1% annual probability event plus 36% climate change: the building footprint in the Low class, with Moderate and Significant hazard in the low ground to the south-west of the site

Figure 5. The figure the Drainage Engineer cited: hazard above Very Low outside the building (AFC addendum, Figure 6, p.18).


The objections and the second refusal

The EA objected on 2 September 2026 because the base FRA was not on the file. Its response noted that the plan and the addendum "both make reference to a Flood Risk Assessment which these documents should be read in conjunction with, however a copy of this document does not appear to be available for review as part of the application documents."


The Drainage Engineer objected again on 3 September 2026, on three points:


  • Refuge: "A safe refuge approach as proposed in the updated FRA would not be supported".

  • Direction: the route "directs future occupants further towards the flooded area, rather than away from it as the station car park is surrounded by Flood Zones 2 and 3 on all sides".

  • Hazard: "Figure 6 in the updated Flood Risk Assessment has shown that there are flooded areas outside of the building with hazard vulnerability that exceeds 'Very Low Hazard – Caution' during the design flood, plus climate change allowances."

Comparison of the hazard classes in the AFC addendum's Table 6, with 85.3% of the flooded area below 0.75, 12.9% from 0.75 to 1.25 and 1.8% from 1.25 to 2.50, against the Runnymede SFRA test of no more than Very Low Hazard – Caution along the full length of the route

Figure 6. The addendum classed hazard against the FD2320 classes. The council judged it against the SFRA test of "no greater than Very Low Hazard– Caution along the full length of the access/escape route". Drawn by AFC from the addendum and the officer report.


Runnymede refused RU.26/1089 on 21 September 2026. The reason, word for word from the decision notice:


"The application introduces more vulnerable use in Flood Zone 3. The documents including Site Specific Flood Modelling and FRA Addendum Ordinary Watercourse Walkover Survey (received 25.08.2026) fail to demonstrate a safe access and egress route required for the safety of future occupants. The lack of safe access and egress would lead to increased risk for future occupiers and additional pressure on emergency services contrary to MA.2(2)(c) of Schedule 2, Part 3, Class MA of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). The proposed development is therefore contrary to policy EE13 of the Runnymede 2030 Local Plan (2020), the Runnymede SFRA (2018), the National Planning Policy Framework (2026)"

What the Chertsey refusals teach

We take four points from the file:


  • Every hazard figure is read against the local test. The addendum reported its site-wide hazard map against the FD2320 classes, with no part of the site reaching Extreme. The objection read the same map against "Very Low Hazard – Caution". A site-wide figure that shows Moderate hazard outside the building will be read as part of the route. The report has to show, stretch by stretch, that the route avoids it.

  • The destination must be land wholly outside the flood extent. The plan placed the assembly point outside the mapped zones. The Drainage Engineer judged the car park to be surrounded by Flood Zones 2 and 3. A destination that floodwater surrounds was not accepted as safe.

  • Refuge is a fallback, never the strategy. The plan offered evacuation first and the first-floor refuge in reserve. The objection still named the refuge approach as not supported.

  • Upload the whole package, with the same levels in every document. The EA objected because the base FRA was missing from the file. The FRA, any addendum and the evacuation plan should go in together. Every design level, floor level and figure should be identical across all three.


Class MA prior approval flood risk: what to submit in Flood Zone 2 or 3

  • A site-specific FRA that places the building, not only the red line, on the current Flood Map for Planning. It states the design flood level for the source that floods the site, with its climate change allowance, and gives the floor level of every ground-floor flat in mAOD.

  • The access and egress route, on publicly accessible roads or paths, to land wholly outside the flood extent, with depth, velocity and hazard for every stretch, read against the local SFRA test.

  • A Flood Warning and Evacuation Plan: the trigger, who acts, the route, the destination and what happens at night. Our guide to what a council wants in a flood emergency plan covers the contents.

  • Consistent levels in every flood document, all uploaded together, with the FRA named in the covering letter.

  • A layout that keeps sleeping above the flood where the ground floor cannot be made safe: no ground-floor bedrooms, or flats only on the upper floors, with resilient construction below the design level.

Flowchart of the questions a council asks on Class MA and flood risk: whether the site is in Flood Zone 2 or 3, whether the building itself is, whether ground floor levels are above the design flood level, whether there is a route to land wholly outside the flood extent within the local hazard limit, and whether the FRA, addendum and evacuation plan are submitted together

Figure 7. The questions in the order a council asks them. AFC's summary of the Order and the Runnymede decisions, not the text of the law.


The Stanmore change of use case study shows a change of use where the FRA came with an evacuation plan. Our two Chertsey case studies record the Class MA office conversion and the neighbouring care home conversion.


When Class MA is the wrong route

Some buildings cannot meet the safe access test, however good the report. The flood extent may surround the building, or the only way out may cross deeper water. A ground floor that cannot be raised may leave flats below the design flood level.


Two other routes put the homes in a different place. A prior approval for an upward extension under Part 20 builds new flats above the existing building, far above the flood level, and leaves the ground floor in its current use. A full planning application allows the layout, the floor levels and the access to change. In Kingston upon Thames, a Class MA prior approval for a ground-floor office unit in Flood Zone 3a, for which we wrote the FRA, was withdrawn in July 2026. The owner then applied for an additional storey of flats under Part 20, also with our FRA. That application is undecided.

Illustrative AI image; not a real site or an AFC project. A paved public footpath climbing a gentle grassy slope away from a river valley towards brick houses on higher ground

Illustrative AI image; not a real site or an AFC project.


Refused prior approval: resubmit or appeal?

A refused prior approval can be appealed to the Planning Inspectorate, or a new application can be made. The Chertsey decision notice gives the appeal period: "if you want to appeal against your local planning authority's decision then you must do so within 6 months of the date of this notice." A new application starts a new 56-day period under W(11)(c).


Resubmit when the evidence can change: a different route, a different destination, or a layout with no homes on the ground floor. Appeal when the documents already on the file meet the local test and the case turns on how they are read. In both cases the same safe access test will be applied again.


Before either, read every consultee response on the file and answer each point in the documents, as our guide to overcoming an Environment Agency objection on flood risk describes. To check whether a site needs an FRA at all, use our flood risk assessment checker.


Frequently asked questions

Do I need a flood risk assessment for Class MA prior approval?

Yes, where any part of the site is in Flood Zone 2 or 3, or in Flood Zone 1 with critical drainage problems notified by the Environment Agency. Paragraph MA.2(4) applies paragraph W so that, wherever W(6) requires the EA to be consulted, the application includes "a site-specific flood risk assessment". Outside those areas an FRA is not required by the Order, though flooding is still a matter the council considers. Our flood risk assessment checker screens a site in a minute.

Does the Sequential Test apply to Class MA office to residential conversions?

No. The matters a council may consider under Class MA are the ones the Order lists, and the Sequential Test is not one of them. The council still judges whether the new homes are safe, which is where most refusals come from. See our Sequential and Exception Test service for full applications, where the test does apply.

What does "flooding risks in relation to the building" mean?

It means the risk to the building and the people who will live in it, not to the whole plot. In Egham (RU.26/0845) the officer report records that "a very small part of the site falls within flood zone 2; however, the building itself is not within the flood zone", and prior approval was granted without an FRA. Where the zone edge runs close to the building, check the footprint against the map yourself. Where the building is in the zone, the council looks at floor levels and the way out.

Can Class MA prior approval be refused on flood risk?

Yes. Runnymede refused two Class MA applications for the same Chertsey office building in 2026 under paragraph MA.2(2)(c), both because a safe access and egress route for the future occupants had not been demonstrated.

What is safe access and egress, and how do I show it?

It is a route people can walk out on, during the design flood, to land outside the flood extent. Show it with a map of the route, depth, velocity and hazard for every stretch read against the local SFRA's limit, and a flood warning and evacuation plan. Our flood hazard rating calculator explains the hazard classes.

Is a first-floor safe refuge acceptable for new flats in Flood Zone 3?

Not as the strategy. Runnymede's Drainage Engineer wrote that "A safe refuge approach as proposed in the updated FRA would not be supported". A refuge can be offered as a fallback, behind a route to land outside the flood extent.

My Class MA was refused on flood risk: should I resubmit or appeal?

Resubmit if the evidence can change: a different route, a different destination or a layout with no ground-floor homes. Appeal if the documents already on the file meet the local test. The Runnymede notice gave 6 months to appeal; a new application gets a new 56-day period.

Does the Environment Agency comment on prior approval applications?

Yes. Paragraph W(6) of the Order requires the council to consult the EA on Class MA sites in Flood Zones 2 and 3. The duty also applies in Flood Zone 1 where the EA has notified critical drainage problems. In practice, check the consultee list on the council's file to see whether the EA was consulted. On RU.26/1089 the EA objected because the base FRA was not on the file. Our guide to overcoming an Environment Agency objection on flood risk covers the response.


Talk to us about your conversion

Converting a building in Flood Zone 2 or 3 under Class MA, or refused on flood risk? Send us the address, the floor plans and any decision notice, and we will tell you what the council will need. Request a fee proposal through our website form, or read more about our flood risk assessments and flood warning and evacuation plans.

 
 
 