SuDS Strategy for a House Extension: When the Council Asks for One, What Goes In, and the Teddington Refusal That Became an Approval
A SuDS strategy for a house extension shows the council how rain falling on the site is to be managed once the extension is built: where it goes, how fast it leaves, and who looks after the system. Many London boroughs now ask for one on householder applications, and in a Critical Drainage Area a thin statement can be refused. For a small site the strategy is short but complete. It covers the drainage hierarchy with a reason for every option rejected, calculations on the whole site area and a drawing with the discharge point and flow control. It also shows an exceedance route, names a maintenance owner and includes the borough's proforma.
A householder extension in Teddington shows the cost of missing those items: a refusal and a dismissed appeal on drainage, then permission in June 2026 for a fresh application with each point answered.
Council asked for a SuDS strategy for your extension, or refused one? Send us the plans and the decision notice through our fee proposal form and we will tell you what it needs. Our SuDS strategy service covers the strategy, the calculations, the drawing and the proforma.
On this page:
when a householder scheme needs a SuDS strategy;
what goes into one, item by item;
50% betterment, and what to write when it cannot be met;
worked example: refused, appeal dismissed, then permitted in Teddington;
a second example: lined tanks on a riverside plot in Twickenham;
refused on drainage: appeal or resubmit;
where householder strategies go wrong, and what to submit;
questions people ask.
When a house extension needs a SuDS strategy
National policy sets the principle. Policy F8 in chapter 18 of the National Planning Policy Framework (published 17 August 2026) states that "Development proposals which could affect drainage on or around the development site should incorporate sustainable drainage systems to control flow rates and reduce volumes of runoff" and that they should do so "in ways which are proportionate to the nature and scale of the proposal". An extension that adds roof or paving can affect drainage. For a householder scheme the question is usually how much detail, not whether drainage is considered at all. More on the national change is in our article on SuDS under the NPPF 2026.
In London, Policy SI 13 of the London Plan states that "Development proposals should aim to achieve greenfield run-off rates" and sets a drainage hierarchy that starts with "rainwater use as a resource (for example rainwater harvesting, blue roofs for irrigation)" and ends with "controlled rainwater discharge to a combined sewer".
The boroughs apply it through their Local Plans and validation lists, and some apply it to householder schemes in so many words.
Richmond upon Thames. The council's sustainable drainage page states: "The Council requires that SuDS are used in all development proposals." It also states that "applicants are required to complete a London Sustainable Drainage Proforma for all planning applications". Flood risk and drainage sit in Policy 8 of the Local Plan adopted on 7 October 2025. Our guide to a flood risk assessment in Richmond upon Thames sets out what officers there ask for.
Kensington and Chelsea. The borough's SuDS page lists the "Eligible development requiring SuDS", including "lower ground/ground floor rear or side extensions" and "outbuildings in the rear garden". It exempts "extensions to upper floors, including roof extensions". A ground-floor rear extension in that borough needs a drainage statement; a loft conversion does not.

Illustrative AI image; not a real site or an AFC project.
Critical Drainage Areas. A Critical Drainage Area is a catchment the borough's Surface Water Management Plan has already identified as one where flooding from surface water affects property. Officers examine even a small extension there as a drainage scheme. A statement that offers only general SuDS suggestions draws a request or a refusal.
Outside London the requirement varies from one council to the next. The local validation list for householder applications is the document to check: it states whether a drainage statement or SuDS proforma is needed for a valid application. Where a site is also in Flood Zone 2 or 3, a flood risk assessment is needed as well. Our guide to a flood risk assessment for extensions covers that side, and drainage strategy vs flood risk assessment explains the difference between the two documents.
What goes into a SuDS strategy for a house extension
The Teddington refusal set out what a council expects better than any checklist. Refusal reason (iii) Flooding on application 24/3221/HOT, as listed in AFC's response table, named six missing items:
no justification for not proposing infiltration;
no rainwater harvesting;
no SuDS drawing showing the discharge point into the sewer via a flow control;
drainage calculations not based on the total site area, with no 24-hour drain-down time and no modelling of the 1 in 100-year event with climate change;
no exceedance flow route drawing;
no maintenance schedule or named owner.
Each item below answers one of them, with the figure from AFC's strategy that went in with the approved application.
Site and impermeable areas, existing and proposed
The strategy starts with the whole site: total area, impermeable area (roofs, paving, hardstanding) and permeable area, each existing and proposed. The council compares runoff across the whole plot, not only from the new roof. At Teddington the site is about 115 m², with about 105 m² impermeable before and after the works and about 10 m² permeable (Figure 1). The extension enlarged the building over existing hardstanding, so the impermeable area did not change.

Figure 1. Existing and proposed areas from AFC's strategy: impermeable area unchanged at about 105 m² of a 115 m² site.
The drainage hierarchy, with a reason for every rejected option
A council wants to see each SuDS option considered in order, and a site-specific reason for every one not used. A single sentence that "SuDS are not feasible" does not meet that. The Teddington strategy tabled fourteen features from the CIRIA SuDS Manual (C753), from green roofs to attenuation tanks, with a reason against each. Green and blue roofs were ruled out by the sloping roof and bioretention by the lack of landscaped space. Swales and filter drains were ruled out by the site's topography and density. Attenuation tanks were kept as a fallback if the planters proved insufficient. Rainwater planters were the feature that fitted the site.
Infiltration: test it, or rule it out with evidence
Infiltration sits second in the London Plan hierarchy and first in the Planning Practice Guidance list of destinations for runoff, "into the ground (infiltration)" (paragraph 056, Reference ID 7-056-20220825). A strategy that steps past it needs evidence. There are two routes.
Test it. A BRE Digest 365 soakage test at the location and depth of the proposed soakaway, before submission. Our article on the BRE 365 soakage test before planning sets out when councils want the result.
Rule it out. Geology, groundwater and space. At Teddington, British Geological Survey mapping shows the London Clay Formation beneath Kempton Park Gravel, and Richmond's Strategic Flood Risk Assessment shows the site at high risk of groundwater flooding. The strategy rules infiltration out on both grounds and says so in the table that answers the refusal.
The AFC infiltration potential map and the groundwater flood risk map give a first screening of both points for any site in England. A screening does not replace a BRE 365 test where a soakaway is proposed.
Rainwater harvesting and source control
Re-use is the first step of the London Plan hierarchy, and its absence was the second refusal item. On a small plot it can be modest. The Teddington strategy routes 66 m² of roof to rainwater planters with 370 litres of storage in total, used for plant watering, each with a flow control. The remaining 39 m² of paving drains to the existing drain.

Illustrative AI image; not a real site or an AFC project.
Runoff rates on the whole site, at every return period
The calculations cover the total site area and give, for the 1 in 1-year, 1 in 30-year and 1 in 100-year events:
the greenfield rate, from the IH124 or FEH statistical method (the UK SuDS greenfield runoff tool is the usual source);
the existing peak rate from the site as it is;
the proposed peak rate with the SuDS in place;
a check of the 1 in 100-year event with the climate change allowance, showing no flooding from the drainage system.

Figure 2. The runoff table from the Teddington strategy: greenfield, existing and proposed rates at 1, 30 and 100 years, and the 40% climate change check.
At Teddington the rate falls from 1.08 l/s to 0.85 l/s in the 1 in 1-year event, a 21% reduction. At 1 in 30 years it is unchanged at 4.23 l/s, and at 1 in 100 years it goes from 5.58 l/s to 5.56 l/s. With a 40% allowance for climate change the 1 in 100-year peak is 7.92 l/s, and the model shows no flooding from the drainage system in any storm run (Figures 3 and 4). The greenfield rates for a 0.0115 ha site are 0.025 l/s at 1 in 1 year and 0.096 l/s at 1 in 100 years.

Figure 3. The same figures as a chart, drawn by AFC from the report's table, with the 50% betterment target of 2.79 l/s at 1 in 100 years.

Figure 4. Calculations on the whole site area with 40% for climate change: no flooding from the drainage system in any storm run.
Drain-down within 24 hours matters because storage still full from one storm has nothing left for the next. The calculations run both the 60-minute and the 24-hour (1,440-minute) storms; the response table records drain-down within 24 hours. A tank or planter that holds water for days fails that test, however large it is.
The drawing: discharge point and flow control
The drawing the refusal said was missing is the simplest document in the pack. It shows where each roof and paved area drains, the SuDS features, the flow control with its size, the connection to the public sewer and the sewer itself (Figure 5). At Teddington the drawing shows the planters with a 21 mm flow control, the surface water drainage to the existing drain and the public surface water sewer to the west. A drainage and water search confirmed the sewer.

Figure 5. The drawing the refusal said was missing: discharge point, flow control and exceedance route on one plan.
Exceedance routes
Every drainage system has a storm larger than its design. The strategy shows where the water goes when that happens, across which surface and away from which doors. On a householder plot this is usually arrows on the drainage plan, as in Figure 5, with a sentence on the route in the text. The exceedance drawing was the fifth refusal item at Teddington.
A maintenance plan with a named owner
A flow control that blocks turns a SuDS feature into a flooding source. The council wants the tasks, how often each is done, and who does it. The Teddington plan follows the CIRIA SuDS Manual tables, for the rainwater planters and the flow control, and names the homeowner as the party responsible (Figure 6). In April 2026 the officer asked specifically for the maintenance of the flow control device, which is why the second table is there.

Figure 6. The maintenance plan, with the flow control table the officer asked for in April 2026.
The borough's proforma
The London Sustainable Drainage Proforma summarises the strategy in four sections: site details, the discharge arrangement and hierarchy, rates and storage, and page references to the report (Figure 7). Several London boroughs will not validate an application without it; our article on a flood risk assessment in Enfield gives one example. Every number in it has to match the report.

Figure 7. The London Sustainable Drainage Proforma, filled in for a householder extension.
50% betterment: when the existing runoff cannot be halved
Richmond's sustainable drainage page states that "Where greenfield run-off rates are not feasible, this will need to be demonstrated by the applicant" and that "the minimum requirement is to achieve at least a 50% attenuation of the site's surface water runoff at peak times". On a householder plot where the impermeable area does not change, halving the peak rate often means digging up hardstanding that the scheme does not otherwise touch.
At Teddington, the strategy first argued compliance with Policy 8 on the basis that the 1 in 1-year rate, 0.85 l/s, is below 2 l/s. A further officer request followed. Revision 4, issued on 12 May 2026, added a section headed "Justification for Inability to Achieve 50% Betterment on Existing Runoff Rates". Its reasoning follows the order a case officer can check:
the development does not increase the impermeable area;
the main option, converting the parking area to permeable paving with sub-surface attenuation, was considered and rejected. The clay geology makes infiltration unsuitable, and the high groundwater risk rules out infiltration-based drainage, soakaways included. The hardstanding stays in its existing form, so a tank beneath it would mean removing and rebuilding it;
rainwater planters are kept as the most feasible source control.
It ends: "achieving the 50% betterment target of 2.79 l/s for the 1 in 100-year event is not feasible. The proposed runoff rate of 5.56 l/s is commensurate with the existing rate of 5.58 l/s". The application was permitted five weeks later. A justification of this kind works where it names the options, gives the physical reason each fails on that site and states the rate achieved. A general statement that betterment is "not practical for a small site" does not.
Worked example: refused, appeal dismissed, then permitted in Teddington
The scheme is a part two-storey, part first-floor extension, with dormers and rooflights, to a former coach house on Vicarage Road, Teddington, in the London Borough of Richmond upon Thames. The site is in Flood Zone 1, in a Critical Drainage Area, and in an area the borough's Strategic Flood Risk Assessment maps at high risk of groundwater flooding.

Figure 8. From refusal to permission: the Teddington extension, April 2025 to June 2026.
The refusal. Application 24/3221/HOT went in with a flood risk assessment by others, dated March 2025, whose drainage was permeable paving with sub-surface attenuation. Richmond refused it on 30 April 2025. Reason (iii) Flooding listed the six items set out above.
AFC's first strategy, and the appeal. Air & Flood Consultants was appointed in June 2025. The strategy replaced the paving and attenuation design with rainwater planters and a flow control to the public surface water sewer. It ruled infiltration out on the groundwater and clay evidence. It added whole-site calculations, the 1 in 100-year plus 40% check, an exceedance drawing, a maintenance plan and the proforma. That strategy went in with the appeal (ref 6000389).
The appeal was dismissed on flood risk. The Inspector's points 12 to 15, as listed in AFC's response table, covered the increase in roof area, Policy 8's requirement to avoid or reduce flooding from all sources, "Greenfield run-off rate, drainage hierarchy and demonstration on how the measures proposed are appropriate in an area at high risk of groundwater flooding", and insufficient information on surface water drainage. AFC's response table records AFC's view that the comments addressed the March 2025 report; the appeal decision itself is not in AFC's file.

Figure 9. Each refusal and appeal point, answered with a page reference.
The fresh application. For a new householder application, PA26/0703, the client and planning agent asked for a table answering each refusal item and appeal points 12 to 15 with a page reference. They also asked for the new Local Plan Policy 8 to be cited. AFC added it in February 2026 (Figure 9).
During determination the officer asked for maintenance details for the flow control and, as relayed by the client, an explicit statement that the "impermeable area is staying the same and that no infiltration is proposed". Revision 3 (20 April 2026) added both. Revision 4 (12 May 2026) added the betterment justification. PA26/0703 was permitted on 16 June 2026.
The same design of planters and flow control was in front of the Inspector and the case officer. What changed between the dismissed appeal and the permission was the presentation: every point answered by name with a page reference, the two explicit statements the officer asked for, the flow control's maintenance, and a written case on betterment. The project page for this job is the SuDS strategy for a house extension in a Critical Drainage Area, Richmond.
A second example: lined tanks on a riverside plot in Twickenham
A house extension close to the tidal Thames at Twickenham shows the other end of the scale. The householder application, for a single-storey extension, a glasshouse and a replacement side lean-to, needed a SuDS strategy under Richmond Local Plan Policy 8 Part H. It had not been submitted when AFC's documents were issued in November 2026, so there is no decision yet.
Here the roofs are larger, 321.5 m² after the works, and there was space for storage. The new roofs drain by way of rainwater tanks to two lined geocellular tanks of 11.5 m³ and 6.2 m³, each behind a 20 mm orifice. Peak runoff falls from 4.19 l/s to 0.53 l/s at 1 in 1 year and from 12.77 l/s to 1.13 l/s at 1 in 100 years. The reduction is 87 to 92% at every event, and the rate never exceeds 1.65 l/s.
The greenfield rate would have needed orifices of 6 to 12 mm, which block easily in a private system, so the design holds to 2 l/s instead. Infiltration is not relied on; BRE 365 testing is recommended, and a rate of 1 × 10⁻⁶ m/s or more would make a soakaway the outfall. The case study has the full figures.
The two jobs show the same council asking the same questions of very different sites. Where there is room, storage brings the rate close to the policy target. Where there is not, the strategy has to show why, in writing, option by option.
Refused on drainage: appeal or resubmit
A householder refusal can be appealed for up to 12 weeks from the date on the decision letter (gov.uk). At Teddington the Inspector supported the extension's design but dismissed the appeal on flood risk. The fresh application, with every drainage point answered, was permitted. One case is not a rule. Where a householder scheme is refused only for missing drainage detail, weigh a resubmission that answers each refusal item by name against an appeal. During determination the officer can ask for a missing statement, as happened at Teddington in April 2026.
New evidence is not taken at appeal. The Planning Inspectorate's procedural guide covers appeals on applications dated on or after 1 April 2026. It says the appellant cannot submit evidence at appeal that the council has not already considered (section 7.3.1). Where a technical report or an amendment to the scheme would overcome the reasons for refusal, the guide says to submit a revised planning application to the council instead (section 7.3.6).
Where householder SuDS strategies go wrong
Calculations on the new roof only. The refusal item was "not based on total site area". The council compares the whole plot before and after.
Infiltration left open. "Infiltration may be possible" with no test and no evidence either way fails the hierarchy. Test it, or rule it out with the geology and groundwater record.
A contradiction inside the report. A hierarchy table that says "infiltration" while the text rules it out, or a conclusion claiming more permeable area than the area table shows, gives the officer a reason to stop. Every table, the proforma and the drawing have to say the same thing.
No flow control size. A planter or tank without a stated orifice or flow control has no rate to check.
Maintenance with no owner. "To be maintained" is not an answer; the homeowner, a management company or a named party is.
Betterment ignored. Where the borough's policy sets a reduction on existing rates, either meet it or justify, option by option, why it cannot be met.
The proforma treated as optional. In several London boroughs it is a validation requirement.
The same points come back at condition stage; our guide to discharging a surface water drainage condition covers that route, and SuDS verification reports cover the step after construction.
What to submit with a householder application
A SuDS strategy, or drainage statement, covering the hierarchy, infiltration, rainwater harvesting, rates on the whole site, drain-down, exceedance and maintenance.
Existing and proposed area plans, with impermeable and permeable areas in m².
A drainage drawing with the SuDS features, the flow control size, the discharge point and the receiving sewer or watercourse.
Calculations for the 1 in 1, 1 in 30 and 1 in 100-year events and the 1 in 100-year event with climate change.
BRE 365 results if infiltration is proposed, or the evidence ruling it out.
A maintenance plan naming who is responsible.
The London Sustainable Drainage Proforma, or the borough's own form.
After a refusal: a table answering each refusal reason and any appeal points, with page references.
What to send for a fee proposal
The existing and proposed plans and elevations, a site plan with the boundary, any topographical survey, the decision notice and officer's report if the scheme has been refused, and any consultee or officer comments received. A drainage and water search, if one has been ordered, shows the sewers and saves a step.
Do I need a SuDS strategy for a house extension?
It depends on the council and the site. National policy F8 asks for sustainable drainage proportionate to the scheme wherever drainage could be affected. Richmond requires SuDS in all development proposals, and Kensington and Chelsea lists ground-floor rear and side extensions and garden outbuildings as development requiring SuDS. Outside London, check the council's local validation list. In a Critical Drainage Area, assume one is needed.
What is the difference between a SuDS strategy and a drainage statement for a householder application?
Councils use both names. Kensington and Chelsea asks for a "drainage statement" with an area plan, a SuDS plan, a hierarchy statement, a maintenance statement and a summary against the National SuDS Standards. A SuDS strategy normally adds runoff calculations and the proforma. Our page on drainage strategy vs flood risk assessment explains how these sit beside an FRA.
What does the council want to see in a SuDS strategy for an extension?
Existing and proposed areas for the whole site, the drainage hierarchy with a reason for each option rejected, infiltration tested or ruled out, rainwater harvesting, greenfield, existing and proposed rates at 1, 30 and 100 years plus climate change, a drawing with the discharge point and flow control, an exceedance route, a maintenance plan with a named owner, and the borough's proforma.
Do I need infiltration testing for a small extension?
Only if the design relies on infiltration. Then a BRE 365 test at the soakaway position belongs before submission. Where clay, high groundwater or lack of space rules infiltration out, the strategy should say so and give the evidence. See our article on the BRE 365 soakage test before planning.
What is 50% betterment on runoff, and do I have to achieve it?
It is a reduction of the existing peak runoff rate by half, set by some boroughs where greenfield rates are not feasible. Richmond's guidance sets "at least a 50% attenuation of the site's surface water runoff at peak times". Where it cannot be met, a written justification naming each option and why it fails on the site was accepted at Teddington, with the 1 in 100-year rate held at 5.56 l/s against 5.58 l/s existing.
What is the London Sustainable Drainage Proforma?
A short form published by the Greater London Authority that summarises a drainage strategy: site details, infiltration and the hierarchy, discharge rates and storage, the SuDS measures and page references to the report. Many London boroughs ask for it with every application, householder schemes included. It is available from the GLA.
My extension was refused on drainage: should I appeal or resubmit?
A householder appeal must be made within 12 weeks of the decision letter. At Teddington the appeal was dismissed on flood risk, and a fresh application answering each refusal item with a page reference was permitted on 16 June 2026. One case is not a rule, but where the only problem is missing drainage detail, a resubmission lets the officer ask for anything still missing.
Can rainwater planters or water butts count as SuDS?
Yes, as rainwater re-use and source control, the first step of the London Plan hierarchy. A planter with a flow control and stated storage can also be counted in the calculations, as at Teddington, where 370 litres of planters served 66 m² of roof. A water butt with no controlled outlet may be full when a storm arrives, so it is shown as harvesting rather than relied on for attenuation.
Enquiries
Air & Flood Consultants prepares SuDS strategies and flood risk assessments for householder extensions across London and the south of England, including responses to refusals. Council asked for a SuDS strategy for your extension, or refused one? Send us the plans and the decision notice through the fee proposal form and we will tell you what it needs.



Comments