Sequential Test for Surface Water Flood Risk: When a Flood Zone 1 Site Can Use the NPPF 2026 Exemption, and What the FRA Must Show
The sequential test for surface water flood risk catches many sites in Flood Zone 1. Under the National Planning Policy Framework of August 2026, the test applies wherever land is at risk "from any form of flooding", so a site the Environment Agency (EA) surface water map clips is caught in principle. Policy F5(2)(b)(ii) takes it out again where the site is at risk of surface water flooding only and a site-specific flood risk assessment (FRA) shows that the layout, design and mitigation keep occupiers and users safe for the lifetime of the development without increasing flood risk elsewhere.
This guide covers that one route: what the FRA has to prove, limb by limb, how to read the map on the whole red line, and how we argued it on a padel centre in Oadby that was granted permission on 23 October 2026. For every other route out of the test, and the new cap on the area of search, see our guide to the flood risk sequential test under the NPPF 2026.
Surface water on part of your site? Send us the red line and the layout, and we will tell you whether the surface water exemption fits and what the FRA must show. Request a fee proposal, or read about our Sequential and Exception Test service.
Why Flood Zone 1 does not settle the sequential test
Flood zones describe river and sea flooding only. Flood Zone 1 means a low probability of flooding from rivers and the sea. It says nothing about rain that falls on the site and the land around it, runs over the ground and gathers in low spots.
The NPPF chapter 18 policies on managing flood risk and coastal change are written for every source. Policy F5(2) opens: "The sequential test should be used in areas known to be at risk now or in the future from any form of flooding, other than for:" and then lists the exemptions.
Policy F4(2)(c) makes the same point for the FRA itself. In Flood Zone 1 an FRA is needed for "Land identified in a strategic flood risk assessment or the Flood Map for Planning as being at risk of flooding from any source, whether now or in the future." Our guide to flood risk assessments outside a flood zone covers when that FRA is needed.
More Flood Zone 1 sites now show surface water because the mapping has changed. The EA published its new National Flood Risk Assessment (NaFRA2) "Risk of flooding from surface water" data on 28 January 2025, according to its page on updates to national flood and coastal erosion risk information. The surface water layers carry depth bands, hazard layers and a climate change extent. A site that showed nothing on the old map can show a band across a corner today, and a wider one with climate change.

Illustrative AI image; not a real site or an AFC project.
The routes out of the test, and where this guide fits
Policy F5(2) lists the cases where the sequential test is not used. Policy F5(2)(b) applies to "Sites where a site-specific flood risk assessment demonstrates clearly that:" one of its two limbs is met.
Route | What it covers |
|---|---|
F5(2)(a) | "Sites allocated in the development plan which were subject to the sequential test during plan preparation" |
F5(2)(b)(i) | No built development, "including access or escape routes", on land at risk "from any source, now and in the future" |
F5(2)(b)(ii) | Sites at risk of surface water flooding only, where the FRA shows users stay safe without increasing risk elsewhere |
F5(2)(c) | Householder development, small non-residential extensions under 250 m², and most changes of use |
The full wording of F5(2)(b)(ii) is: "Where the site would be at risk of surface water flooding only, the proposed layout, design, and mitigation measures would ensure that occupiers and users would remain safe from current and future surface water flood risk for the lifetime of the development without increasing flood risk elsewhere in accordance with policy F7."
The difference between the two (b) limbs matters. Limb (i) asks you to keep every built element, the access included, off land at risk. Limb (ii) lets built development sit on land at surface water risk, provided the design keeps people safe. On a yard that is two-thirds inside the mapped extents, only limb (ii) can work.
An exemption from the sequential test also removes the exception test. Policy F6(2) says "The exception test does not need to be applied:" and F6(2)(a) adds "To those forms of development, or in those circumstances, where the sequential test is not required, as set out in policy F5; or".
The Planning Practice Guidance (PPG) has not caught up with the new numbering. Its flood risk and coastal change guidance still refers to "paragraph 175" of the previous NPPF. Its paragraph on applying the sequential test (Paragraph 027, Reference ID 7-027-20220825, revision date 17 September 2025) already said the test need not be applied "Where a site-specific flood risk assessment demonstrates clearly that the proposed layout, design, and mitigation measures" keep people safe from surface water. The August 2026 NPPF put that route into policy.
The general guide covers the area of search and how to build a full test. The rest of this page is only about route (b)(ii).
The surface water exemption, limb by limb
The exemption has four parts. The FRA has to evidence each one, in that order, before it states the conclusion.

Figure 1. The four limbs of F5(2)(b)(ii), what the FRA must show for each, and the Oadby evidence. Drawn by AFC.
Limb 1: "at risk of surface water flooding only"
Every other source has to be assessed against its own data and shown not to put the site at risk. That means rivers and the sea, groundwater, reservoirs and other artificial sources, and sewers. Absence of a record is not evidence of absence: name the dataset for each.
Rivers and the sea: the Flood Map for Planning zones, present day and with climate change.
Groundwater: BGS geology and the strategic flood risk assessment (SFRA) groundwater mapping.
Reservoirs: the EA reservoir extents, wet day and dry day.
Sewers: the water company's records and the SFRA, and what drives any recorded flooding.
Our guide to the sequential test says any material risk from rivers, the sea, groundwater, sewers or reservoirs closes this route. A sewer rating is the case that needs the most care. Sewer flooding caused by the network failing in heavy rain is the same rainfall that the surface water map models. Sewer flooding from a blockage, a pumping station failure or a foul surcharge is a separate mechanism, and it closes the route.
At Oadby the sewer risk was rated Medium. The report explained why it was not a second mechanism. The SFRA records the 22 June 2023 event as surface water and sewer flooding together, a single storm in which the network was overwhelmed. The report also notes that "the Environment Agency surface water model carries no sewer network at all", so the mapped extents already represent the rainfall a drainage system fails to remove. No mechanism of sewer flooding independent of rainfall had been identified at the site (report pp.3 and 48 to 49).
Limb 2: "layout, design, and mitigation measures"
The FRA must show where each building, the parking and the access sit against the mapped bands, present day and with climate change. It then says what the design does about the parts that are at risk: the layout itself, floor and threshold levels, resilience, and the drainage.
At Oadby, Court 2 occupies the western part of the yard, where the Medium band is concentrated. Court 1 and the ancillary buildings sit towards the east, where the ground is higher and 38.0% of the site lies beyond the 1 in 1000 extent (report p.49). The office and changing units get sealed thresholds, raised sockets and flood-resilient materials (p.36).
Limb 3: "occupiers and users would remain safe"
Safety is shown with depths, hazard and a way out, for the present day and with climate change. A refuge or dry route, and a plan for users, carry this limb. Our flood hazard rating calculator explains the hazard formula, and our guide to what a council wants in a flood emergency plan covers the plan.
The Defra and EA Flood Risks to People method (FD2320) sets four hazard bands, as tabled in the Oadby report (p.37):
Low, under 0.75: caution.
Moderate, 0.75 to 1.25: danger for some, including children, the elderly and the infirm.
Significant, 1.25 to 2.0: danger for most, including the general public.
Extreme, over 2.0: danger for all, including the emergency services.
The EA's NaFRA2 hazard layers apply that formula cell by cell to modelled depth and speed. Read them rather than pairing the deepest water on the site with the fastest.
Limb 4: "without increasing flood risk elsewhere"
This limb is tied to policy F7. The FRA compares impermeable area before and after, sets the discharge rate and shows the SuDS strategy that manages it. Where the impermeable area does not change, the strategy still has to show what happens to the water.
At Oadby the impermeable area was 1,574 m² before and after. The SuDS Strategy added rainwater planters with 300 litres of storage at each court, a 100 litre rainwater harvesting store for the WCs, catchpits and trapped gullies. It replaced a yard in which surface water ran "unattenuated and untreated" (report pp.2 to 3). Infiltration was ruled out on ground conditions and on the proximity of two historic landfills (p.56).
Read the map on the red line and the access, not a point
The first decision is which route you are on, and that depends on what the map shows on the whole site. A postcode search, an address point or a circle round the site centre can miss the one corner the map clips.
On a housing scheme we are working on, a greenfield site in Flood Zone 1 not yet submitted, the fee-stage check read Low on a circle round the site point. The circle did not reach the corners. Read on the traced red line, our first draft report records that the EA's current surface water map (NaFRA2) "shows a 1 in 100-year extent on 1.3 m² at the east corner". The lane frontage just beyond that corner, where the access joins, also sat in a mapped band.

Figure 2. A point or circle check misses the corner; the red line and the access do not. Schematic, drawn by AFC.
The same job taught a second lesson. Our own specialist review of the first draft found that it stated the sequential test with limb (b)(i) only and left out F5(2)(b)(ii). The reviewer's note was blunt: "As drafted, the client's own submission tells the LPA that a Sequential Test applies". The draft was corrected before it went to the client.
To read the map properly:
Trace the red line from the site location plan, not from an address.
Add the access to the public highway and a small buffer round the boundary.
Read every surface water band inside it, present day and with climate change.
List each band with its area and where it lies.
Rate the site at the worst band mapped on it, and give the extent.
Figures 3 and 4 show the Oadby site read that way. Figure 3 is the band table from the report's executive summary. The worst band mapped is High, on 4.5 m² outside the development, and the table says so.

Figure 3. Report the worst band and its extent: High on 4.5 m² (0.3%), outside the development. Redrawn by AFC from the report, p.2.

Figure 4. Flood Zone 1, but the EA surface water extents cross the western part of the yard (report Figure 10).
Worked example: the Oadby padel centre (26/00170/FUL)
The site and the proposal
The application was for two covered padel courts, ancillary modular buildings, fencing and car parking on a vacant former industrial yard on Kenilworth Drive, Oadby, Leicestershire. The site is 1,574 m², wholly hard surfaced, in the Kenilworth Drive Employment Area. It lies wholly in Flood Zone 1. The report classifies the use as water-compatible under Annex F of the NPPF.
We prepared the Flood Risk Assessment, SuDS Strategy and Sequential Test, dated 13 September 2026. The live Oadby case study gives the project summary. The application is on the Oadby and Wigston planning register.

Figure 5. The layout: Court 2 to the west where the Medium band lies; Court 1 and the buildings to the east, on the higher ground (architect's proposed site plan, title block removed).
What the surface water map showed
The 1 in 100 / 1 in 1000 extent covers 62.0% of the site at present day, rising to 68.7% with the climate change allowance (report p.2). That is a large share. It is also why limb (b)(i) was not available: "the largest contiguous part of the Site lying outside the widest modelled surface water extent measures 460 m², against the 1,574 m² the development requires" (p.48).
Depths change with climate change, and the FRA reported both (p.29):
1 in 100 (1% AEP), present day: extent about 577.2 m² (36.7%), "with depths predominantly in the <150 mm band (approximately 496.2 m²), reaching 150-300 mm over approximately 81.1 m²".
1 in 100 with climate change: extent about 717.8 m² (45.6%), "with depths predominantly in the 150-300 mm band (approximately 473.8 m²)".

Figure 6. Depths in the 1 in 100 event: mostly under 150 mm, 150 to 300 mm over about 81 m² (report Figure 11).

Figure 7. With climate change the extent grows to 68.7% of the site: read both (report Figure 13).
Hazard, refuge and egress
The EA hazard mapping records its highest rating on the site, 1.25 or more, "over approximately 7.5 m² at a Low likelihood at present day and 132.8 m² allowing for climate change" (p.3). The FRA reported both figures.
A contiguous 460 m² towards the eastern end lies outside the mapped extent of every modelled event, "including the 1 in 1000 (0.1% AEP) event with the climate change allowance", and is the designated place of safe refuge. It adjoins the public highway (p.49). The report also identifies "a 356 m egress route to land beyond the mapped flow path", "to be walked before an event rather than during it" (p.3).

Figure 8. Hazard read from the EA's NaFRA2 hazard layers (here the 0.75 or more layer), not a hand calculation (report Figure 17).
The exemption argued, and a full test run anyway
We first advised that an FRA and SuDS Strategy could rely on the new exemption. The client chose to commission a full sequential test as well. The report argued F5(2)(b)(ii) limb by limb and then ran the test across the Borough of Oadby and Wigston, the area of search the council used in its own plan-level paper. Ten alternative sites were assessed and none was "both reasonably available and appropriate" for the development (p.55).
The report kept the two apart. In its words: "It does not depend on the exemption and the exemption does not depend on it." (p.48)
The decision
Oadby and Wigston Borough Council granted permission with conditions on 23 October 2026. Condition 2 lists our report, dated 13 September 2026, as an approved document. The only drainage condition is condition 11: "No above groundwork shall be commenced until foul and surface water drainage details, together with a programme of implementation, have been submitted to and approved in writing by the Local Planning Authority."
The decision notice also lists a separate sequential test report by Nexus Planning, dated September 2026. No officer report, LLFA response or EA response was published. How the council weighed the exemption is not on the public file.

Figure 9. From the officer's request to the decision. Drawn by AFC from the report and the decision notice.
Exemption or full test: which to submit
The Oadby job taught us to pick one position and hold it everywhere: either the F5(2)(b)(ii) surface-water-only exemption, or a full test "without prejudice". The client's planning consultant reviewed our draft and caught both problems. In their words: "Page 3 says that a sequential test is not required. Page 47 says that 'a sequential test is therefore engaged'". The final report says, at every point, that the exemption is engaged and that the full test was run in addition.
A back-up test can be worth it when:
the council has not yet applied the new exemption on a decided case;
the "surface water only" limb is arguable, for example a sewer or groundwater rating that needs explanation;
a search of alternative sites is quick and its result is clear.
A back-up test can also hand the officer a document to pick apart. If the alternative sites are thin, or the area of search is open to challenge, a full test invites a refusal the exemption alone would not. Our Bristol case study shows a full sequential and exception test where no exemption was available.
Check what was asked before you scope anything. At Oadby, the officer's request for a "sequential test" was the town-centre test for main town centre uses, not the flood test. Ask for the officer's exact wording first.

Illustrative AI image; not a real site or an AFC project.
Traps that bring back the sequential test for surface water flood risk
A point or circle check. The map clips a corner or the access, and nobody reads it until the officer does.
The climate change extent. Today's extent misses the access; the climate change extent reaches it. Limb 2 and limb 3 must cover both.
An unexplained second source. A Medium sewer or groundwater rating left standing tells the officer the site is not "surface water only". Explain the mechanism, or accept that the route is closed.
A headline rating below the worst band. Rate the site at the worst band mapped on it and give the area and position. A small High band outside the development is a fact to state, not one to soften.
One depth figure for every event. "Predominantly below 150 mm" was true at Oadby for the 1 in 100 event at present day. With climate change, most of that extent was 150 to 300 mm. Give both.
F5 quoted with limb (b)(i) only. The submission then tells the council the test applies unless no built development is at risk, which is not the policy.
Two positions in one report. "Not required" on one page and "engaged" on another invites the officer to choose the one that suits them.
What to submit, and what to send us
For an application relying on F5(2)(b)(ii), the FRA should include:
the red line read against every surface water band, present day and with climate change, with a table of areas;
the assessment of every other source, with the dataset for each, and an explanation of any sewer or groundwater rating;
depth and hazard maps, a refuge or dry route, and an egress route;
the layout against the bands, with floor levels and resilience measures;
the SuDS strategy with impermeable areas before and after, discharge rates and maintenance;
a section stating F5(2) in full and evidencing each limb of (b)(ii).
For a fee proposal, send us:
the red line plan;
the proposed layout, with the access;
any council or pre-application comments;
the officer's exact words, if a "sequential test" has been asked for.
To check whether your use is water-compatible or more vulnerable, try our flood risk vulnerability classification checker. To check whether you need an FRA at all, use our flood risk assessment checker. Our summary of what the NPPF 2026 changed for flood risk assessments covers the wider changes.
Frequently asked questions
Do I need a sequential test if my site is in Flood Zone 1?
Possibly. Policy F5(2) applies the test to land at risk "from any form of flooding", so a Flood Zone 1 site with mapped surface water risk is caught in principle. It falls away if one of the F5(2) exemptions applies, such as surface water only under F5(2)(b)(ii), with an FRA to evidence it.
Does surface water flood risk trigger the sequential test?
Yes, in principle. The August 2026 NPPF covers every source of flooding, and the EA surface water map is part of the Flood Map for Planning. The surface-water-only exemption at F5(2)(b)(ii) is the way out for most such sites.
What is the surface water exemption from the sequential test in the NPPF 2026?
It is policy F5(2)(b)(ii). Where a site is at risk of surface water flooding only, the test is not used if a site-specific FRA shows that the layout, design and mitigation keep occupiers and users safe for the lifetime of the development without increasing flood risk elsewhere, in line with policy F7.
What does a flood risk assessment need to show to use the surface water exemption?
Four things: that surface water is the only source of risk; where the development sits against the mapped bands and what the design does about it; that users stay safe, with depths, hazard and a refuge or route; and that runoff and flood risk elsewhere do not increase. Our flood risk assessment service covers all four.
Does a medium sewer flooding rating stop me using the surface water only exemption?
It depends on the mechanism. Sewer flooding caused by the network failing in heavy rain is the same rainfall the surface water map models, and the FRA can explain that, as ours did at Oadby. A separate mechanism, such as a blockage or a foul surcharge, means the site is not at risk from surface water only.
Only a corner of my site is in the surface water extent. Do I still need a sequential test?
Read the whole red line and the access first. If no built development, access or escape route sits in the extent now or with climate change, F5(2)(b)(i) may apply. If some does, F5(2)(b)(ii) is the route, and the FRA must show the four limbs.
Should I submit a sequential test anyway, just in case?
Only if it is strong and the report keeps it separate from the exemption. A back-up test helps where the council has not yet applied the exemption, but a weak one gives the officer something to refuse on. See our guide to the sequential test under the NPPF 2026.
Is an Exception Test needed if the sequential test doesn't apply?
No. Policy F6(2)(a) says the exception test does not need to be applied "where the sequential test is not required, as set out in policy F5".